Solar Panels on a Property Renovation in Shrewsbury
The project began in early spring 2025 as the builder was starting to knock walls down and reshape the property. One of the first things to get done at this time was the installation of the PV panels onto the rosemary tile roof. Builders generally want scaffolding out of the way ASAP following roof works!
There were to be 9 x 450W All Black JA Solar modules installed on the main roof and and additional 3 on the lower roof. Installing solar panels on a property renovation can make complete sense; scaffolding is likely already required for roof works and the cost of the system in the grand scheme of an extension of renovation is minimal. That being said co-ordinating with the roofer and builder is the most critical aspect of this type of project.